Welty Energy professionals have managed the construction of hundreds of transmission projects and thousands of miles of transmission lines for public and private clients. From voltages up to 765kV, we have the experience to handle all aspects of the process from material procurement, structure erection, wire stringing and overall program management.

In addition, Welty Energy professionals have experience managing the installation of wood, steel pole and steel lattice structures up to 400’ in height. We have managed the construction of steel lattice towers and tubular steel poles using both direct embedment and steel reinforced concrete caissons in a wide variety of soil conditions.

Projects:

  • Lackawanna to North Meshoppen – 26 miles, 230kV lines rebuild
  • Cedar Street to Frisco – 19 miles, 69kV lines rebuild
  • Brookside to Homer  – 11 miles, 69kV circuit rebuild